Tabulam Bridge Replacement

Tabulam Bridge Replacement
In conjunction with our client, LCR Group devised an innovative and cost-effective plan to complete the construction of the main bridge on the Bruxner Hwy over the Clarence river.
Over multiple visits, LCR Group completed the installation of the pre-cast girders utilising a 500t all-terrain crane. LCR Group delivered what we promised on time and the highest level of safety.
Utilising a 500t all-terrain crane, LCR delivered what we promised on time and the highest level of safety.
Case studies
AC1000/9 First lift
The quick setup time resulted in LCR mobilising to site, performing the lift and demobilising from site over three nights.
Wind turbine maintenance
LCR was recently engaged by a renewable energy client to assist in maintenance works on a windfarm facility based in South Western Queensland.
Removal of walkway panels
LCR utilised a SCX–1500 crawler crane to provide ample capacity and the ability to track alongside the drydock.